AUTOMATION, CONTROL, AND INSTRUMENTATION SYSTEMS FOR UNITS 5 AND 6 AT OPOLE POWER PLANT

Investor

PGE GiEK S.A.

Ordering party

GE Power Sp. z o.o.

Scope of work

  • Execution of I&C (Instrumentation and Control) installations for the boiler house buildings of Units 5 and 6 at Opole Power Plant.
  • Design, supply, and installation of a Dynamic Machine Management (DMM) system consisting of ~900 temperature measurement points.
  • Executive design of the automation system.
  • Selection, supply, and installation of: local measurements, temperature sensors and transmitters, pressure and level measurements, as well as speed and flow transmitters.
  • Prefabrication of system/IT cabinets and junction boxes.
  • Prefabrication of system/IT cabinets and junction boxes.
  • Supply and installation of: control cables, power cables, 400V sockets, cable tray systems, and E-Stops.
  • Prefabrication of system/IT cabinets and junction boxes.
  • Prefabrication of system/IT cabinets and junction boxes.
  • Commissioning
  • As-built documentation
  • Personnel training.
  • I&C Control System for Ash Removal, Slag Removal, and Compressed Air Systems for Units 5 and 6:
  • Executive design of the automation system.
  • PLC system programming (SIEMENS S7-400H).
  • Development of the control and visualization system.
  • Supply and commissioning of 4 SCADA stations (WinCC).
  • Development of control sequences.
  • Prefabrication of system/IT cabinets and junction boxes.
  • Prefabrication of system/IT cabinets and junction boxes.
  • Assembly, control, and measurement works.
  • Commissioning, start-up, optimization
  • Configuration of PROFIBUS, MODBUS, and PROFINET networks.
  • Integration with the main Unit DCS system.