CONSTRUCTION OF HIGH-EFFICIENCY COGENERATION GUK I WITH A CAPACITY OF 8 MWe AND 7.8 MWt IN OPOLE
CONSTRUCTION OF THE BRZESZCZE COGENERATION PLANT 5.7 MW
EXPANSION OF EC SP. Z O.O. IN SKIERNIEWICE WITH A HIGH-EFFICIENCY COGENERATION UNIT BASED ON GAS ENGINES
INSTALLATION OF TIGHT BYPASS DAMPERS FOR THE FLUE GAS DESULFURIZATION (FGD) SYSTEMS OF UNITS 1-4 AT OPOLE POWER PLANT
CONSTRUCTION OF A FLUE GAS DESULFURIZATION (FGD) PLANT AT PGE GIEK S.A.
COMPREHENSIVE EXECUTION OF ELECTRICAL AND I&C WORKS (INCLUDING DCS)
MODERNIZATION OF MAIN FEEDING POINTS GPZ 1 AND GPZ 2 ALONG WITH 6/0.4 [kV/kV] SUBSTATIONS AND REPLACEMENT AND LAYING OF NEW SUPPLY CABLES AT THE WIELISZEW WATER TREATMENT PLANT
CONSTRUCTION OF A PEAK LOAD BOILER HOUSE AT ŻERAŃ CHP PLANT
CONSTRUCTION OF THE W-38 ELECTRICAL SUBSTATION AT THE WASTEWATER TREATMENT PLANT
CONSTRUCTION OF UNITS 5 AND 6 AT OPOLE POWER PLANT