CONSTRUCTION OF A COMBINED CYCLE GAS TURBINE (CCGT) BLOCK WITH PEAK LOAD BOILER HOUSE (KRS) IN SIECHNICE

Investor

Kogeneracja S.A.

Ordering party

Polimex Mostostal S.A.

Scope of work

  • Supply and installation of MV and LV cables
  • Assembly of cable trays
  • Execution of post-installation measurements for MV and LV cables
  • Assembly of transformers
  • As-built documentation
  • Participation in commissioning and the initial energization of MV and LV cables
  • Supply and installation of basic and emergency lighting fixtures, cabling, and cable trays
  • Connection of the supplied installations to lighting switchgears
  • Execution of post-installation measurementsh
  • As-built documentation
  • Measurements and commissioning