CONSTRUCTION OF A COMBINED CYCLE GAS TURBINE (CCGT) BLOCK WITH PEAK LOAD BOILER HOUSE (KRS) IN SIECHNICE
Strona główna » CONSTRUCTION OF A COMBINED CYCLE GAS TURBINE (CCGT) BLOCK WITH PEAK LOAD BOILER HOUSE (KRS) IN SIECHNICE
Investor
Kogeneracja S.A.
Ordering party
Polimex Mostostal S.A.
Scope of work
Supply and installation of MV and LV cables
Assembly of cable trays
Execution of post-installation measurements for MV and LV cables
Assembly of transformers
As-built documentation
Participation in commissioning and the initial energization of MV and LV cables
Supply and installation of basic and emergency lighting fixtures, cabling, and cable trays
Connection of the supplied installations to lighting switchgears
Execution of post-installation measurementsh
As-built documentation
Measurements and commissioning
see more
see more
Industry