CONSTRUCTION OF HIGH-EFFICIENCY COGENERATION GUK I WITH A CAPACITY OF 8 MWe AND 7.8 MWt IN OPOLE

Function

Generalny Wykonawca

Investor

ECO Kogeneracja sp. z o.o.

Ordering party

ECO Kogeneracja sp. z o.o.

Scope of work

  • Preparation of design documentation, including the development of a replacement building permit design, executive designs, and obtaining all legally required approvals, opinions, and reports
  • Execution of earthworks and foundation works, and construction of the electrical building and the pumping station building
  • Execution of the heat evacuation system from the cogeneration units
  • Installation of the gas connection for the cogeneration units
  • Supply and installation of the flue gas exhaust system
  • Supply, installation, and commissioning of MV and LV switchgear and switchboards
  • Execution of the electrical power evacuation system from the cogeneration units, including the construction of a 15kV MV cable line (3.2 km)
  • Supply, installation, and commissioning of three containerized gas-fired cogeneration engines
  • Site development and landscaping
  • System start-up and operator training
  • Preparation of as-built documentation
  • Obtaining all necessary, final, and legally binding decisions and permits, including the occupancy permit
  • Warranty service