CONSTRUCTION OF HIGH-EFFICIENCY COGENERATION GUK I WITH A CAPACITY OF 8 MWe AND 7.8 MWt IN OPOLE
Strona główna » CONSTRUCTION OF HIGH-EFFICIENCY COGENERATION GUK I WITH A CAPACITY OF 8 MWe AND 7.8 MWt IN OPOLE
Function
Generalny Wykonawca
Investor
ECO Kogeneracja sp. z o.o.
Ordering party
ECO Kogeneracja sp. z o.o.
Scope of work
Preparation of design documentation, including the development of a replacement building permit design, executive designs, and obtaining all legally required approvals, opinions, and reports
Execution of earthworks and foundation works, and construction of the electrical building and the pumping station building
Execution of the heat evacuation system from the cogeneration units
Installation of the gas connection for the cogeneration units
Supply and installation of the flue gas exhaust system
Supply, installation, and commissioning of MV and LV switchgear and switchboards
Execution of the electrical power evacuation system from the cogeneration units, including the construction of a 15kV MV cable line (3.2 km)
Supply, installation, and commissioning of three containerized gas-fired cogeneration engines
Site development and landscaping
System start-up and operator training
Preparation of as-built documentation
Obtaining all necessary, final, and legally binding decisions and permits, including the occupancy permit