CONSTRUCTION OF OXYGEN AND NITROGEN PLANT IN PŁOCK
Strona główna » CONSTRUCTION OF OXYGEN AND NITROGEN PLANT IN PŁOCK
Investor
PKN Orlen S.A.
Ordering party
Linde GmbH
Scope of work
ELECTRICAL WORKS
Installation of cable trays along with support structures
Installation of MV and LV switchgears, lighting and power distribution boards, control cabinets, inverters, UPS units, busbars, transformers
Cabling MV, LV and control cabling, MV and LV cable terminations, cable glands, installation of 230V and 400V sockets
Installation of electric heat tracing for pipelines and tanks
Installation of lightning protection, grounding system and equipotential bonding, cathodic protection
Installation of basic, emergency and outdoor lighting, fire shut-off system installation
Installation of emergency stop switches, system seals and fire protection seals
Measurements post-installation measurements, functional tests, participation in commissioning
I&C WORKS (Instrumentation and Control)
Installation of DCS/SIS control, protection and visualization systems, installation of control and measurement instrumentation and analyzers for physical and chemical measurements
Cable trays along with support structures, installation of impulse lines, hook-ups and I&C cabling
Connections equipotential bonding, system seals and fire protection seals
Measurements post-installation measurements, commissioning of the installation and automation system, operator training
see more
see more
Environmental protection
TURNKEY CONSTRUCTION OF A 1.6 MWp PHOTOVOLTAIC FARM WITH CARPORTS IN PRZASNYSZ
ELECTRICAL, TELECOMMUNICATIONS AND AUTOMATION WORKS PACKAGE WITHIN THE CONSTRUCTION, EXPANSION AND MODERNIZATION OF THE BEIERSDORF MANUFACTURING POZNAŃ SP. Z O.O. PLANT