Investor
PGE GiEK S.A.
Ordering party
ALSTOM Power Sp. z o.o., POLIMEX Mostostal Sp. z o.o., MOSTOSTAL Warszawa Sp. z o.o.
Scope of work
Execution of electrical and telecommunications infrastructure for the construction site
Maintenance and operation of the construction site and performing the function of Chief Power Engineer for Units 5 and 6
Comprehensive implementation of the power supply system for FGD (Flue Gas Desulfurization) 1-4
Preparation of design documentation
Design of the power supply infrastructure for the Units 5 and 6 construction site
Inventory and relocation of cables in the coal handling and ash removal areas
Executive design for the electrical part of the coal handling system
Execution of general installations in all facilities
Supply of LV (low voltage) switchgears
Execution of cable trays
MV (medium voltage) and LV cable lines
Lighting installation
Power installation
Lightning protection system
IT installation