EXECUTION OF ELECTRICAL AND TELECOMMUNICATIONS INSTALLATIONS AT ITAC IN WROCŁAW

Investor

Amerykańska Firma Produkcyjna

Ordering party

M+W Central Europe Sp. z o.o.

Scope of work

  • Preparation of building and executive designs, and as-built documentation
  • Modernization and addition of bays to the existing medium-voltage (MV) switchgear
  • Execution of MV cable power supplyWykonanie zasilania kablami SN
  • Supply and installation of MV switchgear
  • Supply and installation of a 1000kVA transformer including a busbar connection to the main LV switchgear (RGnN)
  • Supply and installation of low-voltage (LV) switchgears and sub-switchgears
  • Execution of cable trays
  • Execution of complete fire-rated penetrations
  • Execution of complete cabling – main power supply lines (WLZ), power installation, sockets, and lighting cabling
  • Execution of a complete LED lighting installation (including presence sensors, light intensity sensors, and DALI control) with emergency and evacuation fixtures
  • Supply and installation of lighting installation accessories
  • Supply and installation of sockets and electrical outlets
  • Execution of complete lightning protection, grounding, and equipotential bonding installations
  • Execution of LAN, access control (KD), CCTV, and fire alarm (SSP) installations
  • Execution of complete testing and control-measurement works