Strona główna » EXPANSION OF THE PSD 6A FACTORY IN WROCŁAW
Investor
Amerykańska Firma Produkcyjna
Ordering party
M+W Central Europe Sp. z o.o.
Scope of work
Execution of construction site power supply including maintenance of site
Relocation of medium voltage (MV) lines while ensuring the operation of critical devices during plant shutdowns
Preparation of executive and as-built documentation for the electrical installations package
Execution of cable trays
Execution of complete fire-rated penetrations
Expansion of the existing MV switchgear with a new transformer bay; supply and installation of two 2000kVA transformers
Supply and installation of the main low-voltage (LV) switchgear
Supply and installation of facility switchgears
Supply and installation of busbar bridges and busways
Execution of complete cabling – main power supply lines (WLZ), power installation, lighting, and sockets
Execution of a complete LED lighting installation (including presence and light intensity sensor systems, DALI control) with emergency and evacuation fixtures
Supply and installation of lighting installation accessories
Supply and installation of sockets and electrical outlets
Execution of complete lightning protection, grounding, and equipotential bonding installations
Execution of LAN, access control (KD), CCTV, and fire alarm (SSP) installations
Execution of complete testing and control-measurement works