MODERNIZATION OF MAIN FEEDING POINTS GPZ 1 AND GPZ 2 ALONG WITH 6/0.4 [kV/kV] SUBSTATIONS AND REPLACEMENT AND LAYING OF NEW SUPPLY CABLES AT THE WIELISZEW WATER TREATMENT PLANT

Investor

MIEJSKIE PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI W M. ST. WARSZAWIE S.A.

Scope of work

  • Execution of executive designs for electrical, I&C, and telecommunications sectors, as well as building designs, including obtaining occupancy permits.
  • Execution of general construction works in the civil, HVAC, and sanitary sectors at GPZ 1 and GPZ 2 stations.
  • Modernization of equipment and installations in the GPZ 1 and GPZ 2 switchgear buildings, including:
    • Supply and installation of two 26-bay 6kV switchgears,
    • Replacement of busbar bridges,
    • Replacement of two 100kVA auxiliary transformers,
    • Replacement of two 400 VAC auxiliary switchgears,
    • Replacement of transformer protections on the 110kV side,
    • Replacement of the 220 VDC auxiliary switchgear,
    • Replacement of 220V and 24V battery banks,
    • Replacement of facility cabling,
    • Connection of all signaling and control cables necessary for the correct operation of the facilities,
    • Replacement of basic and emergency lighting installations,
    • Replacement of heating installations,
    • Execution of CCTV and access control systems.
  • Renovation of oil sumps for 110kV transformers.
  • Execution of cable lines (supply and control) and fiber optic connections between the modernized facilities.
  • Execution of general construction works in seven 6/0.4kV switchgear stations.
  • Modernization of equipment and installations in the 6/0.4kV switchgear buildings T1, T3, T4, T6, T7, and the ODGW pumping station, including:
    • Replacement of 6/0.4kV switchgears,
    • Replacement of busbar bridges between transformers and switchgears,
    • Replacement of electrical installations (lighting, sockets),
    • Replacement of Automatic Transfer Switch (ATS/SZR) systems,
    • Dismantling of capacitor banks,
    • Replacement of heating installations.
  • Execution of a new redundant SCADA application for all new switchgears/electrical installations with control capabilities (server-client architecture). Integration of the new SCADA application into the existing system.
  • Execution of tests and measurements for new and modernized facilities, devices, cables, and installations.
  • Execution of multi-sector as-built documentation.