TURNKEY CONSTRUCTION OF A 1.6 MWp PHOTOVOLTAIC FARM WITH CARPORTS IN PRZASNYSZ
Strona główna
»
TURNKEY CONSTRUCTION OF A 1.6 MWp PHOTOVOLTAIC FARM WITH CARPORTS IN PRZASNYSZ
Investor
ABB Sp. z o.o.
Ordering party
ABB Sp. z o.o.
Scope of work
Design and execution of the photovoltaic installation on greenfield land (PV1) and on parking carports (PV2 and PV3)
Execution of pile foundations for the carports
Production, delivery, and assembly of the steel structure for the carports
Connection of 3 PV installations to a containerized transformer station
Retrofitting of the investor’s MV station with a line bay and connection to the transformer station
see more
see more
Industry
CONSTRUCTION OF A CONTAINERIZED POWER SUBSTATION AT PCC ROKITA S.A.
zobacz
Energy sector
CONSTRUCTION OF A COMBINED CYCLE GAS TURBINE (CCGT) BLOCK WITH PEAK LOAD BOILER HOUSE (KRS) IN SIECHNICE
zobacz