CONSTRUCTION OF THE WYSOKA WIND FARM – EBOP SCOPE (63 MW)
Strona główna » CONSTRUCTION OF THE WYSOKA WIND FARM – EBOP SCOPE (63 MW)
Investor
Ingka Investments (IKEA)
Ordering party
OX2
Scope of work
Electrical Power Works including comprehensive power evacuation systems:
Executive design and as-built documentation
Supply and installation of HV (High Voltage) cables with a total length of nearly 60 km.
Laying of fiber optic cables along the HV lines.
Supply and installation of a 70 MVA power transformer.
Supply and installation of reactive power compensation equipment.
Supply and installation of outdoor HV apparatus.
Supply and installation of MV (Medium Voltage) and LV (Low Voltage) switchgears.
Supply and installation of MV (Medium Voltage) and LV (Low Voltage) switchgears.
Supply and installation of URST systems (Automatic Load Shedding/Grid Protection).
Supply and installation of telemechanics
Dostawa i montaż instalacji telekomunikacyjnych
Implementation of the SCADA system at the GPO (Main Power Collection) substation
Grid connection and commissioning procedures: EON, ION, FON (Energization, Interim, and Final Operational Notifications)
Civil Engineering Works:
Executive design and as-built documentation.
Construction of the 110/33 kV GPO substation.
Construction of the technical building.
Construction of the power transformer bay/foundation
Foundations for high-voltage apparatus
Firefighting equipment building.
Internal roads and yards.
Fencing, drainage, and landscaping
see more
see more
Energy sector
CONSTRUCTION OF A NEW HIGH-EFFICIENCY COGENERATION POWER FACILITY CONSISTING OF TWO COGENERATION UNITS, THREE GAS-FIRED HOT WATER BOILERS, AND AUXILIARY INSTALLATIONS AND EQUIPMENT