CONSTRUCTION OF THE RUTKI PHOTOVOLTAIC FARM – EBOP SCOPE (100 MWp)

Investor

Bianzone Sp. z o.o.

Ordering party

OX2

Scope of work

Electrical Power Works:

  • Executive design and as-built documentation
  • Supply and installation of HV (High Voltage) cables with a parallel fiber optic path
  • Supply and installation of an 85 MVA power transformer
  • Supply and installation of MV (Medium Voltage) and LV (Low Voltage) switchgears
  • Implementation of the SCADA system at the GPO (Main Power Collection) substation
  • Grid connection and commissioning procedures: EON, ION, FON (Energization, Interim, and Final Operational Notifications)

Civil Engineering Works:

  • Executive design and as-built documentation
  • Construction of the 110/33 kV GPO substation along with a technical building
  • Construction of the power transformer bay/foundation
  • Foundations for high-voltage apparatus
  • Roads and yards, fencing, drainage, and landscaping