CONSTRUCTION OF THE RUTKI PHOTOVOLTAIC FARM – EBOP SCOPE (100 MWp)
Strona główna » CONSTRUCTION OF THE RUTKI PHOTOVOLTAIC FARM – EBOP SCOPE (100 MWp)
Investor
Bianzone Sp. z o.o.
Client
OX2
Scope of work
Electrical Power Works:
Executive design and as-built documentation
Supply and installation of HV (High Voltage) cables with a parallel fiber optic path
Supply and installation of an 85 MVA power transformer
Supply and installation of MV (Medium Voltage) and LV (Low Voltage) switchgears
Implementation of the SCADA system at the GPO (Main Power Collection) substation
Grid connection and commissioning procedures: EON, ION, FON (Energization, Interim, and Final Operational Notifications)
Civil Engineering Works:
Executive design and as-built documentation
Construction of the 110/33 kV GPO substation along with a technical building
Construction of the power transformer bay/foundation
Foundations for high-voltage apparatus
Roads and yards, fencing, drainage, and landscaping
see more
see more
Energy sector
CONSTRUCTION OF A GAS UNIT BASED ON A GAS TURBINE WITH A HEAT RECOVERY STEAM GENERATOR AT PGE EC S.A. KIELCE CHP BRANCH AND SERVICE AGREEMENT FOR THE GAS TURBINE – 8 MWe AND 12.5 MWt