CONSTRUCTION OF THE WYSOKA WIND FARM – EBOP SCOPE (63 MW)

Investor

Ingka Investments (IKEA)

Ordering party

OX2

Scope of work

Electrical Power Works including comprehensive power evacuation systems:

  • Executive design and as-built documentation
  • Supply and installation of HV (High Voltage) cables with a total length of nearly 60 km.
  • Laying of fiber optic cables along the HV lines.
  • Supply and installation of a 70 MVA power transformer.
  • Supply and installation of reactive power compensation equipment.
  • Supply and installation of outdoor HV apparatus.
  • Supply and installation of MV (Medium Voltage) and LV (Low Voltage) switchgears.
  • Supply and installation of MV (Medium Voltage) and LV (Low Voltage) switchgears.
  • Supply and installation of URST systems (Automatic Load Shedding/Grid Protection).
  • Supply and installation of telemechanics
  • Dostawa i montaż instalacji telekomunikacyjnych
  • Implementation of the SCADA system at the GPO (Main Power Collection) substation
  • Grid connection and commissioning procedures: EON, ION, FON (Energization, Interim, and Final Operational Notifications)

Civil Engineering Works:

  • Executive design and as-built documentation.
  • Construction of the 110/33 kV GPO substation.
  • Construction of the technical building.
  • Construction of the power transformer bay/foundation
  • Foundations for high-voltage apparatus
  • Firefighting equipment building.
  • Internal roads and yards.
  • Fencing, drainage, and landscaping