Investor
Guotai Huarong Poland Sp. z o.o.
Ordering party
INPLAG Sp. z o.o. / ATLAS WARD POLSKA Sp. z o.o.
Scope of work
Execution of Electrical Installations including:
Preparation of the Substitute Construction Design
Development of the Executive Design
Supply, laying, and connection of MV cables
Installation of MV switchgear (RSN)
Installation of TR1 and TR2 2500kVA transformers
Installation of busbars
Installation of main LV switchgears (RGnN)
Supply and installation of capacitor banks (BK)
Installation of branch switchgears
Supply and installation of UPS units
Supply and installation of cable trays
Supply, laying, and connection of LV cables
Supply and installation of basic and emergency lighting fixtures, including Ex-rated fixtures
Execution of external area installations
Execution of lightning protection system
Execution of post-installation measurements
Preparation and handover of as-built documentation
Execution of Telecommunications Installations including:
Development of the Executive Design
Execution of the fire alarm system (SSP)
Execution of the structured cabling system (LAN)
Execution of the access control system (KD)
Execution of the CCTV surveillance system, including Ex-rated cameras
Execution of the chemical gas detection system
Execution of post-installation measurements
Preparation and handover of as-built documentation
see more
see more
Energy sector
MODERNIZATION OF MAIN FEEDING POINTS GPZ 1 AND GPZ 2 ALONG WITH 6/0.4 [kV/kV] SUBSTATIONS AND REPLACEMENT AND LAYING OF NEW SUPPLY CABLES AT THE WIELISZEW WATER TREATMENT PLANT