PHASE 1:
Electrical installations supply and assembly:

  • 2000 kVA 15/0.4 kV Al./Al transformer
  • 3200 A Al. busbar between the transformer and the main LV switchgear
  • 400 kVAr capacitor bank with 7% reactors main LV switchgear (RGNN)
  • branch LV switchgears
  • 400 kVAr capacitor bank with 7% reactors
  • central battery system for buildings 4 and 6a
  • health and safety (BHP) equipment
  • UPS unit
  • galvanized cable trays
  • basic lighting fixtures
  • emergency lighting fixtures
  • maintenance socket sets
  • PMS system
  • lightning protection system
  • equipotential system
  • grounding system
  • External electrical installations – dismantling, supply and assembly:
  • dismantling of existing MV and LV cable lines
  • external LED lighting
  • Execution of structured cabling network
  • Execution of fire alarm system (SAP)
PHASE 2
Technology cabling:

  • Supply and installation of cable trays
  • Supply and laying of LV and control cables including connection
  • Assembly of distribution cabinets, patch panels, control boxes, maintenance switches, signaling boxes, signalers, safety switches, etc.
  • Post-installation measurements
  • As-built documentation
  • Participation in commissioning