Prefabrication of PLC control system cabinets with HMI, supply of UPS with batteries and switchgear
Functional design of control algorithms along with operator panel software and documentation
Parameterization of inverters and Simocode protection units, execution of Loop-Check circuit tests
Power and control cabling including connection
Grounding and equipotential bonding, wall and ceiling seals (including EI90 and EI120)
Supply and installation of control and measurement instrumentation, control cabinets, valves and actuators
see more
see more
Energy sector
CONSTRUCTION OF A GAS UNIT BASED ON A GAS TURBINE WITH A HEAT RECOVERY STEAM GENERATOR AT PGE EC S.A. KIELCE CHP BRANCH AND SERVICE AGREEMENT FOR THE GAS TURBINE – 8 MWe AND 12.5 MWt