CONSTRUCTION OF A GAS UNIT BASED ON A GAS TURBINE WITH A HEAT RECOVERY STEAM GENERATOR AT PGE EC S.A. KIELCE CHP BRANCH AND SERVICE AGREEMENT FOR THE GAS TURBINE – 8 MWe AND 12.5 MWt

Role

General Contractor

Investor

PGE Energia Ciepła S.A. Oddział Elektrociepłownia Kielce

Client

PGE Energia Ciepła S.A.

Scope of work

The project includes the comprehensive construction of a power facility in a “turnkey” formula, including:

  • Designing, construction, commissioning, and handing over for operation of a new gas-fired combined heat and power plant based on a Kawasaki gas turbine
  • Gas turbine generator set with a capacity of 8 MWe
  • Heat recovery steam generator (HRSG) with a capacity of 12 MWt
  • Electrical installation with 110kV power evacuation (grid connection)
  • Gas installation including a gas treatment station
  • Heat evacuation installations
  • Auxiliary installations
  • Long-Term Service Agreement (LTSA) for the gas turbine for a period of 5 years