Construction of a flue gas desulfurization plant at PGE GiEK S.A. Branch – Zespół Elektrowni Dolna Odra, Pomorzany Power Plant, including technical infrastructure and the demolition of an electrical switchgear building.

Scope of work

  • Laying of MV cables from the OE switchgear to transformers: 1.6 MVA (2 units) and 1 MVA (2 units)
  • Supply and installation of transformers: 1.6 MVA (2 units) and 1 MVA (2 units)
  • Supply and installation of a two-section LV switchgear BFA 3200A
  • Assembly of cable trays in the desulfurization building
  • Installation of basic and emergency lighting in the desulfurization building
  • Distribution of power and control cables to technological equipment in the desulfurization building
  • Execution of the heating system for technological equipment and pipelines on the pipe rack
  • Lightning protection and equipotential bonding installation for the technological building
  • Lightning protection and equipotential bonding installation for the pipe rack; expansion of the ECONTROL system