CONSTRUCTION OF PRODUCTION PLANT WITH INFRASTRUCTURE FOR GATES POLSKA

Investor

Gates Polska Sp. z o.o.

Ordering party

Kajima Poland Sp. z o.o.

Scope of work

  • Design works
  • Reconstruction of the network in terms of MV lines and IT ducting
  • Modernization and expansion of the existing MV switchgear
  • MV switchgear, two-section 4000A main LV switchgear, 2500kVA transformers, LV cable bridge
  • Internal power consumption switchgears, reactive power compensation, metering systems
  • Distribution busbars
  • Internal power supply lines
  • Fire-rated penetrations
  • LV switchgears
  • Power and plug socket installation
  • Outdoor and indoor LED lighting installation (including presence sensor system, DALI control) along with emergency and directional fixtures
  • Cable trays
  • Lightning protection, equipotential bonding and grounding installation
  • LAN installation, access control system, CCTV installation, fire alarm system (SSP)
  • Testing and measurements