EXPANSION OF THE PSD 6A FACTORY IN WROCŁAW

Investor

Amerykańska Firma Produkcyjna

Ordering party

M+W Central Europe Sp. z o.o.

Scope of work

  • Execution of construction site power supply including maintenance of site
  • Relocation of medium voltage (MV) lines while ensuring the operation of critical devices during plant shutdowns
  • Preparation of executive and as-built documentation for the electrical installations package
  • Execution of cable trays
  • Execution of complete fire-rated penetrations
  • Expansion of the existing MV switchgear with a new transformer bay; supply and installation of two 2000kVA transformers
  • Supply and installation of the main low-voltage (LV) switchgear
  • Supply and installation of facility switchgears
  • Supply and installation of busbar bridges and busways
  • Execution of complete cabling – main power supply lines (WLZ), power installation, lighting, and sockets
  • Execution of a complete LED lighting installation (including presence and light intensity sensor systems, DALI control) with emergency and evacuation fixtures
  • Supply and installation of lighting installation accessories
  • Supply and installation of sockets and electrical outlets
  • Execution of complete lightning protection, grounding, and equipotential bonding installations
  • Execution of LAN, access control (KD), CCTV, and fire alarm (SSP) installations
  • Execution of complete testing and control-measurement works