EXPANSION OF BUILDING NO. 3 – PHASE 5B OF THE FACILITY IN WROCŁAW

Investor

Amerykańska Firma Produkcyjna

Ordering party

MCKB Sp. z o.o.

Scope of work

  • Preparation of executive design and as-built documentation
  • Execution of cable ducting and MV cabling
  • Supply and installation of the MV (Medium Voltage) switchgear
  • Supply and installation of a 2000kVA transformer along with a busbar connection to the 3200A main LV switchgear (RGnN)
  • Supply and installation of LV switchgears and sub-switchgears
  • Supply and installation of capacitor banks (BK)
  • Execution of cable trays
  • Execution of complete fire-rated penetrations
  • Execution of complete cabling – main power supply lines (WLZ), power installation, sockets, and lighting cabling
  • Execution of a complete LED lighting installation (including presence sensors, light intensity sensors, and DALI control); supply and installation of a central battery system with emergency and evacuation fixtures
  • Supply and installation of lighting installation accessories
  • Supply and installation of sockets and electrical outlets
  • Execution of complete lightning protection, grounding, and equipotential bonding installations
  • Expansion of external networks
  • Execution of LAN, access control (KD), CCTV, and fire alarm (SSP) installations
  • Execution of complete testing and control-measurement works