CONSTRUCTION OF A CONTAINERIZED POWER SUBSTATION AT PCC ROKITA S.A.
Strona główna
»
CONSTRUCTION OF A CONTAINERIZED POWER SUBSTATION AT PCC ROKITA S.A.
Investor
PCC Rokita S.A.
Ordering party
PCC Rokita S.A.
Scope of work
Modernization of the existing medium-voltage (MV) switchgear
Execution of excavations and directional drilling under roads within an active chemical production facility
Execution of the power supply for the new transformer station
Supply and installation of a complete transformer station
Supply and installation of a 12-bay MV switchgear
Supply and installation of two 2500kVA transformers
Execution of gas-tight/water-tight system sealings at building entrances
Supply and installation of 4000A busways (2 sets)
Supply and installation of RG38 (7-bay), RPWS, R110DC, RS1 switchgears and meter boards
Execution of telemechanics for the new transformer station
Execution of the fire alarm system (SAP) (including integration into the existing system)
Execution of complete fire-rated penetrations
Execution of complete grounding and equipotential bonding installations
Execution of low-voltage (LV) cabling (reconnecting existing devices to the new transformer station)
Execution of signaling and control cabling
Execution of fiber optic cabling
General construction works
Land surveying services
Parameterization and commissioning of MV and LV switchgears
Execution of complete testing and control-measurement works