Scope of work

Electrical Works including:

  • Modernization of 5 bays of the 6.3kV RSN switchgear
  • Delivery and assembly of transformers
  • Supply and installation of 6.3/0.4kV 2500kVA transformers
  • Supply and installation of 6.3/0.4kV 630kVA transformers
  • Supply and installation of 0.4kV facility switchgears
  • Supply and installation of LED outdoor lighting fixtures – remotely controlled
  • Execution of cabling for technological equipment
  • Supply and installation of AC/DC UPS units including integration into the SAN-DIR system
  • Lightning protection system
  • Basic lighting installation
  • Emergency lighting installation
  • 230/400V power installation
Telecommunications Installations including:

  • Preparation of the executive design for the CCTV surveillance system
  • Preparation of the executive design for the access control systems (SKD and LSKD)
  • Preparation of the executive design for the Intrusion Detection System (SSWiN)
  • Preparation of the executive design for the telephone installation
  • Preparation of executive designs for the public address and sound systems
  • Supply and installation of Fire Alarm System (SSP) components
  • Supply of the switchgear and cabling for the HVAC installation
  • Supply and installation of CCTV surveillance system components
  • Supply and installation of access control system (SKD and LSKD) components
  • Supply and installation of Intrusion Detection System (SSWiN) components
  • Supply and installation of telephone installation components
  • Supply and installation of public address and sound system components