CONSTRUCTION OF UNITS 5 AND 6 AT OPOLE POWER PLANT

Investor

PGE GiEK S.A.

Ordering party

ALSTOM Power Sp. z o.o., POLIMEX Mostostal Sp. z o.o., MOSTOSTAL Warszawa Sp. z o.o.

Scope of work

  • Execution of electrical and telecommunications infrastructure for the construction site
  • Maintenance and operation of the construction site and performing the function of Chief Power Engineer for Units 5 and 6
  • Comprehensive implementation of the power supply system for FGD (Flue Gas Desulfurization) 1-4
  • Preparation of design documentation
  • Design of the power supply infrastructure for the Units 5 and 6 construction site
  • Inventory and relocation of cables in the coal handling and ash removal areas
  • Executive design for the electrical part of the coal handling system
  • Execution of general installations in all facilities
  • Supply of LV (low voltage) switchgears
  • Execution of cable trays
  • MV (medium voltage) and LV cable lines
  • Lighting installation
  • Power installation
  • Lightning protection system
  • IT installation
  • Detailed design