Strona główna » CONSTRUCTION OF A NEW HEAT SOURCE FOR OSTROŁĘKA
Function
Generalny Wykonawca
Investor
ENERGA CIEPŁO OSTROŁĘKA SP. Z O.O.
Ordering party
ENERGA CIEPŁO OSTROŁĘKA SP. Z O.O.
Scope of work
Preparation of comprehensive design documentation, including the basic design, amended building permit design, detailed (IFC) designs, and the update of the existing NCC documentation
Obtaining the full set of administrative decisions and approvals, including the building permit
Execution of preparatory works, including tree clearing, utility relocations, removal of conflicts, site preparation and land grading
Construction of a reserve and peak-load boiler plant comprising 2 gas- and oil-fired hot water boilers (10 MWth each) and 2 electrode hot water boilers (10 MWth each), together with all associated infrastructure
Full integration of the new boiler plant with the existing NCC infrastructure, including upgrades, modifications, and execution of process, thermal, steam, electrical, and I&C (Instrumentation & Control) connections
Design of a complete cogeneration (CHP) system, including buildings with engines and process technology, as well as pipe racks, flue gas ducts and a stack
Design of utility connections, including district heating water, high-methane natural gas, and process pipelines, as well as integration with future expansion through the provision of technological and power supply reserves
Development of the electrical power export system design for 2 × 10 MWe to the National Power System (KSE), including the concept and documentation of the 110 kV infrastructure
Prefabrykacja, dostawa i montaż urządzeń technologicznych, instalacji wewnętrznych, AKPiA oraz systemów bezpieczeństwa i automatyki sterującej
Prefabrication, delivery, and installation of process equipment, internal installations, I&C (Instrumentation & Control) systems as well as safety and control automation systems
Preparation and handover of as-built documentation, operation and maintenance manuals, as well as fire protection and HSE (Health, Safety & Environment) documentation
see more
see more
Energy sector
CONSTRUCTION OF A HIGH-EFFICIENCY COGENERATION (CHP) PLANT WITH A CAPACITY OF 7.4 MWe AND 7 MWth IN MALBORK
CONSTRUCTION OF A NEW HIGH-EFFICIENCY COGENERATION POWER FACILITY CONSISTING OF TWO COGENERATION UNITS, THREE GAS-FIRED HOT WATER BOILERS, AND AUXILIARY INSTALLATIONS AND EQUIPMENT