CONSTRUCTION OF A MODERN 16 MWth ELECTRIC BOILER PLANT IN OPOLE

Function

Generalny Wykonawca

Investor

ECO S.A.

Ordering party

ECO S.A.

Scope of work

  • Preparation of design documentation, including executive designs and obtaining all legally required approvals, opinions, and reports
  • Construction of the electric boiler plant facility (2 × 8 MWth), including civil, structural, and installation works
  • Prefabrication, delivery, and installation of process systems, including electrical installations, I&C (Instrumentation & Control), HVAC, water and sewage systems, pumping systems, heat exchangers, safety systems, and auxiliary infrastructure
  • Execution of process connections between the boiler plant and the district heating network, as well as export of 15 kV medium-voltage power supply, including all necessary cable lines
  • Installation and configuration of control, automation, measurement, monitoring, fire alarm (FAS), and CCTV systems, including full control software
  • Cold and hot commissioning, mechanical and technological trials, and functional measurements and tests
  • Preparation and handover of as-built documentation, operation and maintenance manuals, as well as fire protection and HSE (Health, Safety & Environment) documentation
  • Warranty service