CONSTRUCTION OF A HIGH-EFFICIENCY COGENERATION (CHP) PLANT WITH A CAPACITY OF 7.4 MWe AND 7 MWth IN MALBORK
Strona główna » CONSTRUCTION OF A HIGH-EFFICIENCY COGENERATION (CHP) PLANT WITH A CAPACITY OF 7.4 MWe AND 7 MWth IN MALBORK
Role
General Contractor
Investor
ECO Kogeneracja Sp. z o.o.
Client
ECO Kogeneracja Sp. z o.o.
Scope of work
Preparation of design documentation, including executive designs and obtaining all legally required approvals, opinions, and reports
Execution of foundation works and civil-structural construction
Supply, installation, and commissioning of the engines, including all associated infrastructure
upply and construction of the Main Grid Supply Point, including 15/110 kV transformation and power export to the substation
Supply, prefabrication, and installation of electrical, power, thermal, and sanitary systems, as well as all auxiliary installations
Installation of control and safety systems (smoke, fire, and gas detection; fire protection and explosion protection systems)
Control software, including configuration, testing, diagnostics, and capability for future development and modification
Cold and hot commissioning, mechanical and technological trials, and functional measurements and tests
Warranty service