CONSTRUCTION OF A HIGH-EFFICIENCY COGENERATION PLANT WITH A CAPACITY OF 8 MWe AND 9.2 MWt IN TARNÓW
CONSTRUCTION OF A COMBINED CYCLE GAS TURBINE (CCGT) BLOCK WITH PEAK LOAD BOILER HOUSE (KRS) IN SIECHNICE
CONSTRUCTION OF HIGH-EFFICIENCY COGENERATION GUK II WITH A CAPACITY OF 8 MWe AND 7.8 MWt IN OPOLE
CONSTRUCTION OF A GAS UNIT BASED ON A GAS TURBINE WITH A HEAT RECOVERY STEAM GENERATOR AT PGE EC S.A. KIELCE CHP BRANCH AND SERVICE AGREEMENT FOR THE GAS TURBINE – 8 MWe AND 12.5 MWt
CONSTRUCTION OF A NEW HIGH-EFFICIENCY COGENERATION POWER FACILITY CONSISTING OF TWO COGENERATION UNITS, THREE GAS-FIRED HOT WATER BOILERS, AND AUXILIARY INSTALLATIONS AND EQUIPMENT
CONSTRUCTION OF HIGH-EFFICIENCY COGENERATION GUK I WITH A CAPACITY OF 8 MWe AND 7.8 MWt IN OPOLE
CONSTRUCTION OF THE BRZESZCZE COGENERATION PLANT 5.7 MW
EXPANSION OF EC SP. Z O.O. IN SKIERNIEWICE WITH A HIGH-EFFICIENCY COGENERATION UNIT BASED ON GAS ENGINES
INSTALLATION OF TIGHT BYPASS DAMPERS FOR THE FLUE GAS DESULFURIZATION (FGD) SYSTEMS OF UNITS 1-4 AT OPOLE POWER PLANT
CONSTRUCTION OF A FLUE GAS DESULFURIZATION (FGD) PLANT AT PGE GIEK S.A.