COMPLETE MODERNIZATION OF THE MAIN POWER SUPPLY SUBSTATION
CONSTRUCTION OF A HIGH-EFFICIENCY COGENERATION (CHP) PLANT WITH A CAPACITY OF 7.4 MWe AND 7 MWth IN MALBORK
CONSTRUCTION OF A MODERN 16 MWth ELECTRIC BOILER PLANT IN OPOLE
CONSTRUCTION OF A NEW HEAT SOURCE FOR OSTROŁĘKA
Construction of a Waste-to-Energy Plant in Opole
CONSTRUCTION OF A HIGH-EFFICIENCY COGENERATION PLANT WITH A CAPACITY OF 8 MWe AND 9.2 MWt IN TARNÓW
CONSTRUCTION OF A COMBINED CYCLE GAS TURBINE (CCGT) BLOCK WITH PEAK LOAD BOILER HOUSE (KRS) IN SIECHNICE
CONSTRUCTION OF HIGH-EFFICIENCY COGENERATION GUK II WITH A CAPACITY OF 8 MWe AND 7.8 MWt IN OPOLE
CONSTRUCTION OF A GAS UNIT BASED ON A GAS TURBINE WITH A HEAT RECOVERY STEAM GENERATOR AT PGE EC S.A. KIELCE CHP BRANCH AND SERVICE AGREEMENT FOR THE GAS TURBINE – 8 MWe AND 12.5 MWt
CONSTRUCTION OF A NEW HIGH-EFFICIENCY COGENERATION POWER FACILITY CONSISTING OF TWO COGENERATION UNITS, THREE GAS-FIRED HOT WATER BOILERS, AND AUXILIARY INSTALLATIONS AND EQUIPMENT