Scope of work
Preparation of design documentation, including executive designs and obtaining all legally required approvals, opinions, and reports
Execution of construction and installation works in accordance with the design documentation
Supply, installation, and commissioning of the installed equipment
Installation and configuration of control and automation systems, including full control software
Mechanical and process tests, as well as measurements and functional testing
Preparation and handover of as-built documentation, operation manuals, and fire protection documentation and HSE (Health, Safety & Environment) documentation